The big items are now getting done. We finished the upholstery on the walls that will define the sleeping space. We added 2″ insulation to the inside of the panels.
The flooring wood finally came in over the insulated floor.
![]() |
3/8 Merante Marine Plywood over 1/2″ ISO-foam insulation over 1/2″ foam used for floor padding |
![]() |
Work Horse tools next to the back floor inspection port which will allow access for electrical cords when on shore power |
![]() |
2″ 3m Thinsulite insulation installed |
![]() |
Adding 2″ of Styrofoam to the main sleeping areas. This area needed more insulation, or at least had the space for it. |
![]() |
Nancy adding the finishing touches |
![]() |
Walls complete |